Accessible HTML - production-format sample

See the Arkansas delivery format.

This text companion follows the same twelve selected pages as the visual sample: official Arkansas template pages followed by the same types of source-backed appendices used in paid delivery.

Same delivery format12 selected pagesNo customer data

Public sample only. Not a project SWPPP and not for filing, certification, construction, inspection, or field use.

Sample page 1 of 12

Official ARR150000 cover

The paid packet opens with the official Arkansas SWPPP cover. The permittee or operator comes from customer-confirmed input; the authorized project date remains blank until execution; the prepared-by organization is LSD AI Studio.

Sample page 2 of 12

Official page 1 - project, responsibility, and receiving waters

Project and operator information comes from customer input. Acreage and sequencing are supported by the uploaded plan set. Runoff values are calculated from documented inputs. Soils and receiving-water entries come from source-backed lookups and customer review.

Fields represented by this page

  • Project name, location, optional parcel number, operator, project description, and construction sequence.
  • Total and disturbed acreage, pre- and post-construction runoff coefficients, and soil or discharge-quality information.
  • Responsible parties, contact details, and assigned SWPPP roles.
  • Receiving-water chain, MS4 question and name, and ultimate receiving-river selection.

Names, phones, locations, acreage, waterbodies, MS4 selections, and river-basin selections are not represented in this public sample.

Sample page 3 of 12

Official page 2 - water-quality screening

The exact waterbody, pollutant or listing category, and additional-control language appear only when supported by the current official screening result and the reviewed project record.

Fields represented by this page

  • Whether stormwater enters a 303(d)-listed waterbody or a waterbody with an approved TMDL.
  • The matched waterbody, pollutant or listing category, project-identification question, and any supported additional controls.
  • The water-quality-standards acknowledgment and the beginning of the official site-map requirements.

Yes or No selections, project-identification responses, and acknowledgments remain blank until the applicable official result and operator decision are resolved.

Sample page 4 of 12

Appendix inventory

The paid packet includes the completed Arkansas form followed by applicable runoff, inspection, location, soils, plan-sheet, BMP, permit, amendment, training, rain, inspection, and environmental records.

Sample page 5 of 12

Appendix A - runoff coefficient computation

The official Arkansas computation form retains total area; existing and proposed impervious and pervious areas; four distinct documented coefficients; calculated results; and the supporting source record.

Equations shown on the official form

  • Pre-construction runoff coefficient = ([B × C] + [D × E]) / [A].
  • Post-construction runoff coefficient = ([F × G] + [H × I]) / [A].

Official calculation notes

  1. Impervious area includes paved areas, areas covered by buildings, and other impervious surfaces.
  2. Use 0.95 unless a lower or higher runoff coefficient can be verified.
  3. Pervious area includes vegetation, most unpaved or uncovered soil surfaces, and other pervious areas.
  4. Refer to the local Hydrology Manual for typical coefficient values.

The impervious and pervious surfaces should equal the total area.

No acreage or coefficient is represented in the public sample.

Sample page 6 of 12

Appendix B - blank inspection form

The official ARR150000 inspection form is included as a blank field record. It provides fields for inspector identity, inspection date, rainfall, discharges, additional BMPs, construction activity, stabilization, maintenance, SWPPP changes, responsible-official signature, date, and title.

Certification statement printed on the form

“I certify under penalty of law that this document and all attachments such as Inspection Form were prepared under my direction or supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.”

No inspection, rainfall event, discharge, corrective action, signature, or certification is represented.

Sample page 7 of 12

Appendix C - location and receiving-water evidence

A paid packet contains site-specific local and regional exhibits generated from project coordinates resolved from the user-uploaded plan set. The receiving-water record retains the named official sources, matched records, access date, query status, and customer review.

The public sample contains no map, road, parcel, coordinate, marker, or waterbody name.

Sample page 8 of 12

Appendix D-1 - soils map and SSURGO data

Soils are determined from official sources used by the Builder based on project coordinates resolved from the user-uploaded plan set. The paid packet retains the area of interest, dataset, access date, map units, AOI percentages, hydrologic groups, and K-factor values.

Paid soils-summary structure
Map unitNameAOIHydrologic groupK factor
[Official result][Returned map-unit name][Calculated][Source value][Source value]

No soil geometry or value is invented or represented in the public sample.

Sample page 9 of 12

Appendix D-2 - erosion and sediment control sheet

A complete erosion-control sheet is extracted from the user-uploaded plan set. The source filename, plan date or revision, source PDF page, and review status remain attached.

Sample page 10 of 12

Appendix D-2 - drainage and grading sheet

A complete drainage and grading sheet is extracted from the user-uploaded plan set. The source filename, plan date or revision, source PDF page, and review status remain attached.

Sample page 11 of 12

Appendix E - plan-supported BMP specifications

Each paid BMP record contains the supported control, installation schedule, maintenance and inspection expectations, customer-assigned responsible role, and source plan or detail reference.

Final BMP design, sizing, location, adequacy, installation, maintenance, and implementation remain with the project team and applicable professionals.

Sample page 12 of 12

Blank continuing records

The sample shows blank amendment and rainfall-log structures. In paid delivery, these records appear with applicable training, delegation, inspection, and environmental appendices. No event, amendment, approval, or signature is represented.