Arkansas StormwaterA Stormwater Builder serviceBuilder by LSD AI Studio
Need help?

Arkansas Stormwater · Document builder

Arkansas SWPPP Builder

You're in the secure document builder. Upload the plan set, review the extracted Arkansas project facts, confirm the few decisions only the permittee can make, and receive the completed PDF and editable DOCX from one place.

Start here

Upload the current plan-set PDF first. Confirm the permittee details while analysis runs.

Launch price

$495

Best when the scope is clear and you want a faster start.

Best fit

Arkansas projects that need a cleaner path for SWPPP intake, review, and draft preparation.

What comes back

A final regulatory PDF and editable DOCX containing the completed Arkansas form, maps, soils exhibits, plan sheets, and source BMP specifications.

Intake

Start with the plan set, then confirm the facts needed before final generation.

Client-facing workflow
Step 1

Upload the current plan set

Start here. The plan set supplies the project boundary and most site facts; the short questionnaire below is for decisions the plans cannot make for you.

PDF preferred
What's this?

Upload the current civil construction set, including the cover, grading, drainage, and erosion-control sheets. The project boundary is normally shown on one of the first sheets. A single PDF up to 250 MB works best.

No files selected yet. Start with the current civil plan-set PDF.

You can review the confirmation questions below while analysis runs.

Step 2

Confirm the project facts

You can analyze the plan set first. Complete these items before final document generation so the system never has to guess at permittee decisions.

0/12 confirmed

Project basics

Use the current schedule. These values can be updated before final generation.

What's this?

Use the project name shown on the cover sheet or title block. This becomes the project name throughout the SWPPP.

County and MS4 are automatic

The builder reads the legal description, resolves the mapped project location, and checks Arkansas county, municipal-boundary, and regulated-MS4 records. You can review the result before generation.

What's this?

Use the best current estimate for when construction activity or land disturbance will begin. It can be updated later if the schedule changes.

What's this?

Use the best current estimate for when construction and final stabilization will be complete.

Permittee

The permittee is the legal entity responsible for permit coverage—not necessarily the engineer, general contractor, or project name.

What's this?

Enter the exact legal name of the company or organization that will obtain permit coverage. This should match the permittee name used in the NOI.

What's this?

This is the day-to-day contact for the permittee. It does not have to be the person who signs the certification.

What's this?

Use the permittee's mailing address, which may be different from the construction site's address.

What's this?

Enter the permittee contact's job title, such as Project Manager, Development Manager, or Owner.

Project structure

These two decisions determine how the plan acreage is carried into the SWPPP.

What's this?

Choose self-development when the permittee controls development of the overall site. Choose finished-lot project when the permittee purchased completed or partially completed lots from another developer.

What's this?

A project can be part of a larger common plan when multiple lots, phases, or parcels are developed under one coordinated plan—even when different entities build them.

Inspection form

The final SWPPP will include a blank example of the form your inspectors will use.

What's this?

Choose the ADEQ form unless your company already uses a different inspection form that contains the ARR150000-required fields. If you choose your own form, the builder will ask you to upload a blank PDF after the plans are analyzed.

Responsible / cognizant officialFinish before final documents

The person authorized to certify the completed SWPPP information.

What's this?

This is the responsible or cognizant official authorized to certify the SWPPP information. You can finish this after plan analysis.

What's this?

Enter the responsible official's title exactly as it should appear in the certification section.

What's this?

Leave this blank until the responsible official is ready to certify the final document.

Add project contactsOptional

Superintendent, SWPPP contact, preparer, and 24-hour emergency contact.

What's this?

Contact information for the person or company preparing the SWPPP. This can be left blank and completed later.

What's this?

The person managing day-to-day construction activity at the site. This may be different from the permittee contact.

What's this?

The person who should receive SWPPP questions, inspection records, and compliance correspondence.

What's this?

The person or dispatch service that can respond to an urgent stormwater or spill issue at any time.

Permit setting

ARR150000 is selected for normal Arkansas construction coverage.

What's this?

ARR150000 is the normal Arkansas construction stormwater general permit target. Change this only when the project has been directed to another permit path.

Still needed before final document generation

These do not prevent plan analysis. Return to them before generating the final PDF and editable DOCX.

  • Project name
  • Estimated project start date
  • Estimated project completion date
  • Operator name
  • Operator legal entity or company
  • Operator mailing address
  • Operator phone
  • Operator email
  • Operator title
  • Project development model
  • Larger common plan status
  • Inspection form